Project Experience

Natal World Cup 2014 Stadium Natal, Brazil - 12/09 to 2/10

  • Project Architect during concept design and coordinatino of Projeto Basico (Basic Project Elements) package.  Coordinated outline specifications.  Reviewed architectural, structural, and MEP documents and narratives.
  • Arrowhead Stadium Expansion Kansas City, Missouri - 7/07 to 2/10

  • MEP systems coordinator from mid-design development through construction phases.  Project involved taking a 40 year old open-air facility and upgrading it to fully conditioned spaces housing all of the luxuries and amenities of a modern NFL stadium.
  • Chiefs Training Facility Kansas City, Missouri - 6/07 to 7/07

  • Project Architect in an advising role to the Architect of Record.  General coordination of documents, in-depth coordination of roofing systems and 'showpiece' lobby roof.
  • Dolphins Expansion Miami, Florida - 10/06 to 7/07

  • Architectural coordination on extensive upgrades to amenities in the existing Pro Player Stadium.
  • Minnesota Vikings Master Plan Minneapolis, Minnesota - 11/06 to 3/07

  • Technical support of budget analysis and stadium 3D modeling to support Master Plan design by Roma Group of San Fransisco.  Coordinated freelance watercolor renderings.
  • Anaheim NFL Study Anaheim, California - 7/06 to 10/06

  • Lead Architect on an intensive 12 week schematic study of a new NFL facility adjacent to Angels Stadium, supporting a cost estimate and "apples-to-apples" comparison to alternate project at the existing L.A. Colliseum (by a separate design team).
  • Mall of America - Phase II Bloomington, Minnesota - 2/06 to 6/06

  • Project Architect on 5M sqft expansion - schematic design phase general coordination of structural, MEP, ice rink configuration, gross leasable retail area studies.
  • Riverside Casino & Golf Resort Riverside, Iowa - 8/05 to 5/06

  • Lead Project Architect on a multipurpose facility including a gaming floor, 1,200 seat event center, 3 restaurants, 4-star hotel, spa, golf pro shop, and championship golf course by Rees Jones.
  • Arena Am Ostbahnhof Berlin, Germany - 5/05 to 8/05

  • Lead Architect on a multipurpose arena in downtown Berlin. Completed schematic design documentation and coordinated early design of all disciplines.
  • Devils Arena Newark, New Jersey – 10/04 to 5/05

  • Building systems coordination through Design Development phase, including MEP, A/V, Broadcast, Scoreboards, Lighting, Fire Protection, Tel-Data, Food Service, Civil, Catwalks and Concert Rigging. Coordination of fašade elements and rooflines designed by Morris Adjmi Partners.
  • Cardinals Stadium Glendale, Arizona – 1/03 to 10/04

  • Structural and civil coordination through completion of concrete superstructure, including coordination of building envelope designed by Peter Eisenman. Catwalks and roof service access coordination. Coordination of moving roof and moving field elements. Mentoring CADD/production Coordinator.
  • Glendale Arena Glendale, Arizona– 12/01 to 1/03

  • Structural and Civil Coordination through construction of superstructure. Catwalks, concert rigging, and exterior enclosure detailing. Mentoring CADD/production Coordinator.
  • Cardinals Stadium Tempe, Arizona– 1/00 to 12/01

  • Structural and Civil coordination through early Construction Documents, including skin, catwalks, and roof access coordination. Mentoring CADD/production coordinator.
  • Pepsi Center Office and Restaurant Addition Denver, CO – 12/00 to 5/01

  • Lead PA through design and documentation, including coordination of all disciplines and document production.
  • Reliant Stadium Houston, Texas– 10/99 to 7/00

  • Document planning and coordination through Bidding Packages. Responsibilities included exterior enclosure coordination and detailing, expansion joints, cartoon set, and coordination of scope division within the document between 3 architectural firms.
  • Pepsi Center Denver, Colorado– 16/98 to 10/99

  • Construction administration through last 18 months of construction, including tracking Submittals, Requests For Information, site visits, and punchlist.  Extensive CADD coordination.
  • Ravens Stadium Baltimore, Maryland– 5/96 to 6/98

  • Architectural production through 80% CA, including coordination of railings, skin & slab detailing, and expansion joints. Assisted site representation for 4 months. CADD and production coordination from initial 100% Construction Documents package through Construction Administration.
  • Various Design/Build Projects within the Greater Kansas City Area, Missouri and Kansas – 10/95 to 3/96

  • Involvement with all phases and tasks related to around a dozen residential and commercial projects, including high-end home remodeling, laboratory expansion, daycare, McDonalds Playland additions, and charity work for homeless shelters.
  • Various Movie Theater Projects (90% U.S., 10% international)– 8/94 to 10/95

  • Single and multiplex theater design from concept phase through construction documents. Assisted with selection and specifying of Novell Netware network, trained as Netware administrator, and provided primary support for hardware, software and user training in a 25-person office.

  • updated 05/07/10